A building contractor is to dig a foundation 30 style=”background-color:transparent;color:rgb(0,0,0);”> feet long, 21 feet wide, and 6 feet deep. The contractor pays $25 per load for trucks to remove the dirt. Each truck holds 7 cubic yards. What is the cost to the contractor to have all the dirt hauled away?
A building contractor is to dig a foundation 30
style=”background-color:transparent;color:rgb(0,0,0);”> feet long, 21 feet wide, and 6 feet deep. The contractor pays $25 per load for trucks to remove the dirt. Each truck holds 7 cubic yards. What is the cost to the contractor to have all the dirt hauled away?
Looking for a Similar Assignment? Order now and Get 10% Discount! Use Coupon Code "Newclient"
