A possible short-term problem in controlling overhead costs would be detected by which of the following variances? A. Both the fixed overhead spending variance and the volume variance.
Question
[ 9 ] A possible short-term problem in controlling overhead costs would
be detected by which of the following variances?
A.
Both the fixed overhead spending variance and the volume variance.
B.
Both the variable overhead spending variance and the volume variance.
C.
The spending variance but not the volume variance.
D.
The volume variance but not the fixed overhead spending variance.