b) are a checklist for lean operations.
b) are a checklist for lean operations.(C) have become a list of seven items in
American practice.
(D) can be used to assist with necessary changes in organizational culture.
(E) All of these are true
| Question 7.7. (TCO 3) Which of the following is not a reason for variability?(Points : 3) |
(a) Employees, machines, and suppliers produce units late.
(b) Customer demand is unknown.
(c) Employees, machines, and suppliers produce units that conform to standards. (d) Engineering drawings are inaccurate.
(e) Drawings or specifications are incomplete.
| Question 3.3. (TCO 3) Which of the following is a goal of JIT partnerships? (Points : 3) (a) Reduce inventory and variability(b) Increase variability (c) Increase in-transit inventory (d) Elimination of engineering changes |