define the deck production gap as the difference between the targetnumber of decks and all currently produced decks (hint: use thespecifications to determine the target number of decks)• define the time to adjust decks’ production in order to reduce the gap as10 months (for example)• the deck production rate is then defined as a ratio of the deck productiongap and the time to adjust decks’ production• the decks get broken at some break rate (1 deck is broken normally in 10months), but the breaks happen more often when there are more decks
Document Preview:
Assignment #1Modelling “Vasa” construction
• System Dynamics Model of a ship construction project
• Three dynamic processes (over 120 months):
1. construction of decks (0 decks to begin with)
2. production of cannons (0 cannons to begin with)
3. the King is writing letters (1 letter to begin with)
• Specifications:
1. specified number of cannons (initially, 150)
2. specified density (initially, 50; measured in cannons per
deck)Construction of decks
• define the deck production gap as the difference between the target
number of decks and all currently produced decks (hint: use the
specifications to determine the target number of decks)
• define the time to adjust decks’ production in order to reduce the gap as
10 months (for example)
• the deck production rate is then defined as a ratio of the deck production
gap and the time to adjust decks’ production
• the decks get broken at some break rate (1 deck is broken normally in 10
months), but the breaks happen more often when there are more decks