PLANNING TECHNIQUES
11
174 PROJECT PLANNING TECHNIQUES
11
5.5. Refer to Figures 5.5 a and 5.5 b, and assume the following:
· Assume that tasks 3.2.1.1, 3.2.3.1, and 3.2.4.1 each require 1 person for 2 weeks.
· Assume that task 3.2.2.1 will require 2 persons for 4 weeks.
· Assume that tasks 3.2.1.2 and 3.2.1.3, 3.2.3.2 and 3.2.3.3, and 3.2.4.2 and
3.2.4.3 and will each require 1 person for 1 week.
· Assume that tasks 3.2.2.2 and 3.2.3.3 will require 2 persons for 2 weeks.
· Assume that task 3.2.5 will require 2 persons for 2 weeks.
a. Prepare a schedule network for the 13 tasks, showing sequential and concurrent activities and milestones.
b. P repare a list of the 13 tasks. List the EST, LST, EFT, and LFT for each task.
c. L ist the tasks on the critical path using the ESTs and LSTs.
d. U sing the critical path, list the time needed to complete the 13 tasks.
e. P repare a staffi ng profi le for the 13 tasks using the EST for each task.
5.6. Using the template for work packages in Table 5.3 a, design work packages for 5 of the 12 tasks in Table 5.4 and Figure 5.6 . You will have to “ invent ” some of the missing information; be creative but not ridiculous.
TABLE 5.3A Template for work packages
Task identifi er: | « WBS number and name» |
Task description: | « brief description» |
Estimated duration: Resources needed: | « days or weeks » |
Personnel: | « numbers of people needed to complete this task » |
Skills: | « personnel skills needed to complete this task » |
Tools: | « software and hardware needed» |
Travel: | « to where? for how long?» |
Other: | « other resources needed to complete this task » |
Predecessor tasks: | «t o be completed before this task can begin» |
Successor tasks: | « to start after this task is completed » |
Work products: | « outputs of this task » |
Baselines: | « work products to be placed under version control » |
Risk factors: | « potential problems for this task » |
Acceptance criteria: | «f or the work products of this task » |
TABLE 5.4 A task list
Activity number | Description | Predecessors | Duration | Staff
number |
2.1 | Receive approval to proceed | — | — | — |
3.1 | Analyze requirements | 2.1 | 1 | 2 |
3.2 | Design | |||
3.2.1 | Redesign existing components | 3.1 | 6 | 4 |
3.2.2 | Design new components | 3.1 | 3 | 1 |
3.2.3 | Design interfaces | 3.2.2 | 1 | 2 |
3.3 | Implement code | |||
3.3.1 | Implement new code | 3.2.2 | 6 | 2 |
3.3.2 | Modify existing code | 3.2.1, 3.2.3 | 5 | 1 |
3.4 | Finish implementation | |||
3.4.1 | Develop integration plan | 3.2.2 | 2 | 2 |
3.4.2 | Finish unit testing | 3.3.1, 3.3.2 | 2 | 2 |
3.4.3 | Update documentation | 3.3.1, 3.3.2 | 2 | 3 |
3.5 | Integrate and test | |||
3.5.1 | Develop integration tests | 3.4.1 | 1 | 3 |
3.5.2 | Perform integration tests | 3.4.2, 3.4.3, 3.5.1 | 1 | 2 |
3.6 | Perform acceptance tests | 3.5.2 | 1 | 1 |
m.n = tasks; (x) = activity duration
=
milestones;
1
2
3
4
6
7
8
9
10
5
3.1
3.2.2
3.2.3
3.3.1
3.4.1
3.5.1
3.4.3
3.4.2
3.5.2
3.6
(1)
(3)
(6)
3.3.2
(5)
(2)
(0)
(2)
(1)
(1)
(1)
(1)
(6)
(2)
3.2.1
weeks
16
2.1
n
critical path
FIGURE 5.6 A critical – path activity network
T ABLE 5.5 Milestones for the schedule network in Figure 5.6
Event | Description |
1 | Project initiation |
2 | Requirements analysis completed |
3 | Design of new components completed |
4 | Existing components redesigned; interfaces to new components designed |
5 | Integration plan completed |
6 | New code implemented; existing code modifi ed |
7 | Documentation updated |
8 | Unit testing completed; documentation updated; integration tests ready |
9 | Inte |
10 | Acceptance tests completed |
“Is this question part of your assignment? We Can Help!”
PLANNING TECHNIQUES was first posted on August 31, 2019 at 12:59 pm.
©2019 "Classroom Essays". Use of this feed is for personal non-commercial use only. If you are not reading this article in your feed reader, then the site is guilty of copyright infringement. Please contact me at Academicheroes.com
Source link
“Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!”
PLANNING TECHNIQUES was first posted on August 31, 2019 at 1:00 pm.