Train Iliidmpangir maites widgets, and eam widget TEQUTFE 4 pounds of material at $5 per pound. EDD and Bill} widgets will be built in March and April, respectively.
Train Iliidmpangir maites widgets, and eam widget TEQUTFE 4 pounds of material at $5 per pound. EDD and Bill} widgets will be built in March and April, respectively. Train keeps material [In hand at 25% of the next month’s production needs
Haw much is the total materials cost for March? {I} a} $3,250 0 b} $1250 O c} team ‘3’ d] ntnne of these {I} e} asp