30. Ifthe cost of capital for the project shown below is 2.5 percentage points less than the project’s IRR (for example, if the project’s IRR is 12%, the cost of capital is 9.5%), what is the NPV of the projem‘? Year Cash Flow ($2 10,000) $40,000 $50,000 $50,000 $60,000 $70,000 $0,000 mm-h-mNn—D
30. Ifthe cost of capital for the project shown below is 2.5 percentage points less than the project’s IRR
(for example, if the project’s IRR is 12%, the cost of capital is 9.5%), what is the NPV of the projem‘? Year Cash Flow
($2 10,000)
$40,000
$50,000
$50,000
$60,000
$70,000
$0,000 mm-h-mNn—D