Best writers. Best papers. Let professionals take care of your academic papers

Order a similar paper and get 15% discount on your first order with us
Use the following coupon "FIRST15"
ORDER NOW

I need help with this question. This is from my financial and strategic

I need help with this question. This is from my financial and strategic
management of projects class. I don’t know what else to do.

ATTACHMENT PREVIEW Download attachment
You and your spouse have purchased a foreclosure you hope to Fip for a pro±t. The two bathrooms hadbeen recently remodeled by the previous owners. The three bedrooms need only cosme²c work –something you decide to undertake yourself. The majority of your budget will be used for remodeling thekitchen, the dining room, and the family room.Since this is your ±rst Fip, you’ve hired an experienced home inspector to help you scope the project.You want to track costs carefully to stay as close to budget as possible and to give you an accuratebaseline for similar work in future Fips. Rather than doing a hierarchical decomposi²on of the projectinto various products/outcomes and then adding work package descriptors for each lowest-levelproduct/outcome, you chose to list the components that needed work and then describe the work thatmust be completed for each of these components. NOTE: Assume your descrip²ons of the work thatmust be completed for each of the components are work package descriptors and that these workpackage descriptors are NOT decomposed into lower level elements.Some of the work may have to take a higher priority if cost issues arise during the renova²on. The higherpriority work includes modi±ca²ons to the electrical, HVAC, and plumbing systems, removal of two wallsto provide an open concept arrangement, and common Fooring throughout the kitchen, family room,and dining room areas. The quality of other ±nishes in the kitchen, dining room, and/or family room mayhave to be reduced if the cost of the higher priority work becomes an issue.You decide to work backwards from your current list of work (shown below) to develop a WBS. You startby adding an element that represents the en²re project and numbering it zero. You also decide to addseveral control accounts so that you can monitor and manage costs more e³ec²vely. These controlaccounts include:Higher Priority WorkLower Priority WorkU²li²es and Services (Electrical, HVAC, and Plumbing)Wall RemovalsKitchenDining Room (DR)´amily Room (´R)1.Without otherwise modifying the WBS structure, add the control accounts listed above.2.Complete numbering the work breakdown structure so that Microsoµ Project will automa²callyroll up work package costs to these control accounts.NOTE: Your WBS must not violate any WBS core characteris±cs.
Background image of page 1
View the Answer
WBS No.WBS Element
Background image of page 2
Show

 
Looking for a Similar Assignment? Order now and Get 10% Discount! Use Coupon Code "Newclient"