PMAN 639: PROJECT QUALITY MANAGEMENT
FINAL EXAM A. Please answer the following True or False questions [each worth 2 points) I) Brainstorming is a fundamental tool of problem solving True False
2) A process is capable if the variations fall within the control limits.
True False 3) Control charts are used to determine if there are unexpected changes in the process.
True False 4) 4 items in parallel, each having a reliability of I185 have an overall system
reliability of {1.999. True False 5) u? chart is used when the number of defects per unit is fixed at 11 True False E) A process in control may still produce unacceptable output.