job was timed for 60 cycles and had an average of 1.2 minutes
job was timed for 60 cycles and had an average of 1.2 minutes per
piece. The performance rating was 91 percent, and workday allowances are 11 percent. Determine each of the following:
Observed time. (Round answer to 1 decimal place.)
Normal time. (Round answer to 2 decimal places.)
Standard time. (Round answer to 2 decimal places.)